| Floor | Raised floor system with floor box (1 floor box per 9 sq m) |
| Ceiling | Suspended metal ceiling system, Ceiling panels installed for building services installation |
| Wall Finish | Plaster finish and painting to internal walls and columns |
| Fire Services | Automatic sprinkler and smoke detector system |
| Airconditioning | Overhead variable air volume (VAV) units with thermostats and diffiusers |
| Light Boxes | Fully recessed light boxes with fluorescent tubes |
| Curtain Wall | Double glazed curtain wall system with alumunum mullions, upstands and skirting |
| WIndow Blinds | Vertical window blinds |
| Electrical Connections | Floor boxes under raised floor system, Trunking along central core walls for whole floor users |